Guatemala

Jump to navigationJump to search

Country Details

See Wikipedia

National Railway System

There is no national railway and no private railway systems

Tourist Lines

  • Guatemala Railway Museum - The Museum appears to be open Tuesday to Sunday - but a check is recommended. They do not appear to have a website, but are active on Instagram and Facebook.

About once a month they also offer short rides of either 15 minutes in duration, or 30 minutes. The 15 minute rides stay inside the railway yard area with a round trip distance of 2.9km. The 30 minute rides are believed to exit the yard area. Events with rides are usually advertised about a week in advance.

Trams, Metro and Light Rail

See future changes

Recent and Future Changes

Recent Changes

None

Future Changes

Guatemalan President Bernardo Arévalo announced in March 2024 that an underground metro line will be built in Guatemala City and the first stage will be opened in mid-2027.

Special Notes

None