Angola: Difference between revisions

Jump to navigationJump to search
m Infrastructure: R of Road - Not know but mainly single track.
 
(18 intermediate revisions by the same user not shown)
Line 1: Line 1:
==Country Details==
==Country Details==
See [https://en.wikipedia.org/wiki/Angola Wikipedia]
See [https://en.wikipedia.org/wiki/Angola Wikipedia]
<!--
 
==National Railway System==
==National Railway System==
===National Railway Operator===
===National Railway Operator===
DETAILS
The Instituto Nacional dos Caminhos de Ferro de Angola (INCFA) was merged with the National Institute of Road Transport (INTR), in December 2021, to form the [https://www.antt.gov.ao/pt/ National Land Transport Agency] (ANTT).
-->
 
There are three separate Cape Gauge lines:-
 
*North line (Luanda Railway) (CFL) ~480 km.
 
*Central line (Benguela Railway) (CFB) ~1330 km, operated by the Lobito Atlantic Railway (LAR) joint venture with a 30 year concession which started in 2022.
 
*South Line (Moçâmedes Railway) (CFM) ~910 km.
 
==Timetable==
==Timetable==
* Online: unofficial timetable information is available at [https://www.fahrplancenter.com/AngolaEntry04.html Fahrplancenter]. Note that this may be substantially out of date.
* Online: unofficial timetable information is available at [https://www.fahrplancenter.com/AngolaEntry04.html Fahrplancenter]. Note that this may be substantially out of date.
Line 31: Line 39:
==Ticketing==
==Ticketing==
DETAILS
DETAILS
 
-->
==Infrastructure==
==Infrastructure==
<!--
===Infrastructure Authority===
===Infrastructure Authority===
DETAILS
DETAILS
Line 38: Line 47:
===Network Statement===
===Network Statement===
DETAILS (MAY NOT EXIST)
DETAILS (MAY NOT EXIST)
 
-->
===Gauge===
===Gauge===
DETAILS
*1,067 mm (3 foot 6 inches) Cape Gauge (~2,700 km}.
*600 mm (1 foot 11 +5⁄8 inch) ~ 120 km in 2002.


===Electrification===
===Electrification===
DETAILS
*None
 
===Rule of the road===
===Rule of the road===
DETAILS
* Not know but mainly single track.
 
<!--
===Distances===
===Distances===
DETAILS
DETAILS
Line 57: Line 66:
DETAILS
DETAILS
-->
-->
==Metros==
==Metros==
A four line metro system is planned for Luanda [with yellow, red, blue and green lines], with construction of the first 60 km approved to start in 2025.  
A four line metro system is planned for Luanda [with yellow, red, blue and green lines], with construction of the first 60 km approved to start in 2025.  

Latest revision as of 00:21, 1 December 2024

Country Details

See Wikipedia

National Railway System

National Railway Operator

The Instituto Nacional dos Caminhos de Ferro de Angola (INCFA) was merged with the National Institute of Road Transport (INTR), in December 2021, to form the National Land Transport Agency (ANTT).

There are three separate Cape Gauge lines:-

  • North line (Luanda Railway) (CFL) ~480 km.
  • Central line (Benguela Railway) (CFB) ~1330 km, operated by the Lobito Atlantic Railway (LAR) joint venture with a 30 year concession which started in 2022.
  • South Line (Moçâmedes Railway) (CFM) ~910 km.

Timetable

  • Online: unofficial timetable information is available at Fahrplancenter. Note that this may be substantially out of date.
  • Printed: summary timetables are available in some editions of the European Rail Timetable.

Infrastructure

Gauge

  • 1,067 mm (3 foot 6 inches) Cape Gauge (~2,700 km}.
  • 600 mm (1 foot 11 +5⁄8 inch) ~ 120 km in 2002.

Electrification

  • None

Rule of the road

  • Not know but mainly single track.

Metros

A four line metro system is planned for Luanda [with yellow, red, blue and green lines], with construction of the first 60 km approved to start in 2025.

Recent and Future Changes

Future Changes

The first phase of the Luanda Surface Metro System (MSL) has been approved, for the capital Luanda, with construction of 60 km of the yellow line scheduled to start in 2025.

Lines with Obscure or Sparse Passenger Services

See Angola - Lines with Obscure or Sparse passenger services.

See also