Côte d'Ivoire: Difference between revisions

Jump to navigationJump to search
Abidjan: 38 km std. gauge metro
 
(6 intermediate revisions by the same user not shown)
Line 3: Line 3:


==Railway System==
==Railway System==
The railway system consists of a single railway, which links Abidjan with Ouagadougou, in Burkina Faso. It is currently operated by Sitarail, a private company, under contract to the Côte d'Ivoire and Burkina Faso governments.
The railway system consists of a single railway, which links Abidjan with Ouagadougou, in Burkina Faso. It is currently operated by [https://fr.wikipedia.org/wiki/Sitarail Sitarail], a private company, under contract to the Côte d'Ivoire and Burkina Faso governments.  


See also [https://www.sinfin.net/railways/world/ivoire.html Railways in Côte d’Ivoire] description at sinfin.net.
See also [https://www.sinfin.net/railways/world/ivoire.html Railways in Côte d’Ivoire] description at sinfin.net.
Line 10: Line 10:
===Gauge===
===Gauge===


* Metre
* Metre (660 km).


===Electrification===
===Electrification===
Line 22: Line 22:
* Online: unofficial timetable information is available at [https://www.fahrplancenter.com/Sitarail.html Fahrplancenter]. Note that this may be substantially out of date.
* Online: unofficial timetable information is available at [https://www.fahrplancenter.com/Sitarail.html Fahrplancenter]. Note that this may be substantially out of date.
* Printed: summary timetables are available in some editions of the [[Links#ERT | European Rail Timetable]].
* Printed: summary timetables are available in some editions of the [[Links#ERT | European Rail Timetable]].
==Maps==
<!--
===Printed Maps===
DETAILS
-->
===Web-based Maps===
[https://fr.wikipedia.org/wiki/Sch%C3%A9ma_de_la_ligne_d%27Abidjan_%C3%A0_Ouagadougou Abidjan-Ouagadougou railway].
<!--
==Ticketing==
DETAILS
-->


==Other Railways==
==Other Railways==
Line 32: Line 44:
===Abidjan===
===Abidjan===
A 38 km standard gauge [https://www.lemetrodabidjan.ci/ metro system] is under construction; it may be opened in 2028. See also [https://fr.wikipedia.org/wiki/M%C3%A9tro_d%27Abidjan Wikipedia (French language)].
A 38 km standard gauge [https://www.lemetrodabidjan.ci/ metro system] is under construction; it may be opened in 2028. See also [https://fr.wikipedia.org/wiki/M%C3%A9tro_d%27Abidjan Wikipedia (French language)].
<!--
 
==Recent and Future Changes==
==Recent and Future Changes==
===Recent Changes===
===Recent Changes===
DETAILS
Renovating the 1,260-kilometre of line through to Burkina Faso, which had first been announced in 2015, started 4 December 2022 and is expected to take eight years.
 
<!--
=== Future Changes===
=== Future Changes===
DETAILS
DETAILS

Latest revision as of 22:54, 1 December 2024

Country Details

See Wikipedia

Railway System

The railway system consists of a single railway, which links Abidjan with Ouagadougou, in Burkina Faso. It is currently operated by Sitarail, a private company, under contract to the Côte d'Ivoire and Burkina Faso governments.

See also Railways in Côte d’Ivoire description at sinfin.net.

Infrastructure

Gauge

  • Metre (660 km).

Electrification

  • None

Rule of the road

  • Not known; probably single throughout

Timetable

There does not appear to be a Sitarail website.

  • Online: unofficial timetable information is available at Fahrplancenter. Note that this may be substantially out of date.
  • Printed: summary timetables are available in some editions of the European Rail Timetable.

Maps

Web-based Maps

Abidjan-Ouagadougou railway.

Other Railways

None known

Tourist Lines

None known

Metro and light rail systems

Abidjan

A 38 km standard gauge metro system is under construction; it may be opened in 2028. See also Wikipedia (French language).

Recent and Future Changes

Recent Changes

Renovating the 1,260-kilometre of line through to Burkina Faso, which had first been announced in 2015, started 4 December 2022 and is expected to take eight years.

Lines with Obscure or Sparse passenger services

None known.