Uganda: Difference between revisions

Jump to navigationJump to search
Create skeleton page
 
m Headings amended
 
(4 intermediate revisions by one other user not shown)
Line 1: Line 1:
==Country Details==
==Country Details==
See [https://en.wikipedia.org/wiki/Uganda Wikipedia]
See [https://en.wikipedia.org/wiki/Uganda Wikipedia]
<!--
 
==National Railway System==
==National Railway System==
===National Railway Operator===
===National Railway Operator===
DETAILS
[https://urc.go.ug/ Uganda Railways Corporation]
-->
 
==Timetable==
==Timetable==
* Online: unofficial timetable information is available at [https://www.fahrplancenter.com/BotswanaTT.html Fahrplancenter]. Note that this may be out of date.
* Online: [https://urc.go.ug/service/passenger-services/ Passenger Services]. Note that this is described as a "Tentative Passenger Train Time Schedule"!
* Printed: summary timetables are available in some editions of the [[Links#ERT | European Rail Timetable]].
* Printed: summary timetables are available in some editions of the [[Links#ERT | European Rail Timetable]].
<!--
<!--
===Journey Planner===
===Journey Planner===
Line 41: Line 40:
===Network Statement===
===Network Statement===
DETAILS (MAY NOT EXIST)
DETAILS (MAY NOT EXIST)
 
-->
===Gauge===
===Gauge===
DETAILS
Metre gauge


===Electrification===
===Electrification===
DETAILS
None
 
<!--
===Rule of the road===
===Rule of the road===
DETAILS
DETAILS
Line 65: Line 64:
==Trams==
==Trams==
DETAILS
DETAILS
 
-->
==Recent and Future Changes==
==Recent and Future Changes==
===Recent Changes===
===Recent Changes===
DETAILS
Emergency rehabilitation work on the line from Tororo, near the Kenyan border, to Mukono (near Kampala) has been completed. Work on the Mukono - Kampala section started in April 2023.


=== Future Changes===
=== Future Changes===
DETAILS
On 24 September 2024 the Ministry of Works & Transport signed a €2.7bn contract for construction of a 273km electrified standard gauge line from Malaba, on the Kenyan border, to Kampala.
-->
 
==Obscure and Sparse Passenger Services==
Reconstruction work, lasting about two years, has started on the 382 km line from Tororo to Gulu, in the north west. This has had no traffic for about 30 years. It is planned to introduce a passenger service and to transport at least 500,000 tonnes of freight by 2025-26.
None known - the compilers would be grateful for any updates.
 
<!--
<!--
See [http://www.psul4all.free-online.co.uk/wbe.htm#MG PSUL: World Beyond Europe]
==Special Notes==
==Special Notes==
DETAILS
DETAILS
-->
-->
==Lines with Obscure or Sparse passenger services==
None known.
[[Category:Countries in Africa]][[Category:Countries]]
[[Category:Countries in Africa]][[Category:Countries]]

Latest revision as of 21:39, 2 November 2024

Country Details

See Wikipedia

National Railway System

National Railway Operator

Uganda Railways Corporation

Timetable

Gauge

Metre gauge

Electrification

None

Recent and Future Changes

Recent Changes

Emergency rehabilitation work on the line from Tororo, near the Kenyan border, to Mukono (near Kampala) has been completed. Work on the Mukono - Kampala section started in April 2023.

Future Changes

On 24 September 2024 the Ministry of Works & Transport signed a €2.7bn contract for construction of a 273km electrified standard gauge line from Malaba, on the Kenyan border, to Kampala.

Reconstruction work, lasting about two years, has started on the 382 km line from Tororo to Gulu, in the north west. This has had no traffic for about 30 years. It is planned to introduce a passenger service and to transport at least 500,000 tonnes of freight by 2025-26.

Lines with Obscure or Sparse passenger services

None known.