Uruguay: Difference between revisions

Jump to navigationJump to search
mNo edit summary
 
(21 intermediate revisions by 3 users not shown)
Line 1: Line 1:
==Country Details==
==Country Details==
See [https://en.wikipedia.org/wiki/Uruguay Wikipedia]
See [https://en.wikipedia.org/wiki/Uruguay Wikipedia]
<!--
 
==National Railway System==
==National Railway System==
===National Railway Operator===
===National Railway Operator===
DETAILS
[https://www.afe.com.uy/ Administración de Ferrocarriles del Estado (AFE).]
-->
 
==Passenger Railway services==
* The Tacuarembó-Rivera rail line in northern Uruguay is currently the only section in Uruguay where are passenger trains in operation (as at January 2025)
 
==Timetable==
==Timetable==
* Online: officiaal timetable information is available at [https://www.afe.com.uy/modificacion-del-itinerario-de-trenes-de-pasajeros/ Administración de Ferrocarriles del Estado]  
* Online: official timetable information is available at [https://www.afe.com.uy/modificacion-del-itinerario-de-trenes-de-pasajeros/ Administración de Ferrocarriles del Estado]  
* Online: unofficial timetable information is available at [https://www.fahrplancenter.com/AIFFLAUruguayIndex.html Fahrplancenter]. Note that this may be out of date.
* Online: unofficial timetable information is available at [https://www.fahrplancenter.com/AIFFLAUruguayIndex.html Fahrplancenter]. Note that this may be out of date.
* Printed: summary timetables are available in some editions of the [[Links#ERT | European Rail Timetable]].
* Printed: summary timetables are available in some editions of the [[Links#ERT | European Rail Timetable]].
Line 23: Line 26:


-->
-->
==Maps==
[https://www.afe.com.uy/mapa-ferroviario/ A.F.E. railway map]
==Engineering Information==
==Engineering Information==
[https://www.sacyr.com/en/-/ferrocarril-central Uruguay Central Railroad project]
[https://www.sacyr.com/en/-/ferrocarril-central Uruguay Central Railroad project]
<!--
<!--
==Maps==
==Maps==
Line 54: Line 59:
===Rule of the road===
===Rule of the road===
DETAILS
DETAILS
 
-->
===Distances===
===Distances===
DETAILS
[https://es.wikipedia.org/wiki/Ferrocarril_en_Uruguay Kilometre information at the bottom of this page]
 
<!--
==Other Railways==
==Other Railways==
DETAILS
DETAILS
Line 69: Line 74:
==Trams==
==Trams==
DETAILS
DETAILS
<!--
==Special Notes==
DETAILS
-->
==Lines with Obscure or Sparse passenger services==
See [[Uruguay - Lines with Obscure or Sparse passenger services]].


==Recent and Future Changes==
==Recent and Future Changes==
===Recent Changes===
===Recent Changes===
DETAILS
The Ferrocarril Central Railroad project in Uruguay rehabilitated and constructed a 273km railway line connecting the capital city of Montevideo with the city of Paso de los Toros. The railway line became operational in April 2024.


=== Future Changes===
=== Future Changes===
DETAILS
-->


==Obscure and Sparse Passenger Services==
A 35km light rail route has been proposed to link central Montevideo with El Pinar.
See [http://www.psul4all.free-online.co.uk/wbe.htm#UY PSUL: World Beyond Europe]
 
<!--
==See also==
==Special Notes==
{{Navbox Uruguay}}
DETAILS
[[Category:Countries in South America]]
-->
[[Category:Countries]]
[[Category:Countries in South America]][[Category:Countries]]

Latest revision as of 06:54, 22 April 2025

Country Details

See Wikipedia

National Railway System

National Railway Operator

Administración de Ferrocarriles del Estado (AFE).

Passenger Railway services

  • The Tacuarembó-Rivera rail line in northern Uruguay is currently the only section in Uruguay where are passenger trains in operation (as at January 2025)

Timetable

Some information is available at the Man in Seat 61.

Maps

A.F.E. railway map

Engineering Information

Uruguay Central Railroad project

Distances

Kilometre information at the bottom of this page

Lines with Obscure or Sparse passenger services

See Uruguay - Lines with Obscure or Sparse passenger services.

Recent and Future Changes

Recent Changes

The Ferrocarril Central Railroad project in Uruguay rehabilitated and constructed a 273km railway line connecting the capital city of Montevideo with the city of Paso de los Toros. The railway line became operational in April 2024.

Future Changes

A 35km light rail route has been proposed to link central Montevideo with El Pinar.

See also