Uzbekistan: Difference between revisions
Jump to navigationJump to search
→Recent Changes: Samarkand tramway operating again by 3/2025 |
→Metro and light rail systems: Tashkent/Toshkent tramway |
||
(20 intermediate revisions by the same user not shown) | |||
Line 3: | Line 3: | ||
==Railway System== | ==Railway System== | ||
===National Railway Operator=== | ===National Railway Operator=== | ||
Uzbekistan Railways (Uzbek: Oʻzbekiston Temir Yoʻllari) are the national rail carrier. | |||
===Maps=== | ===Maps=== | ||
* Online: [https://web.archive.org/web/20230128200833/http://www.bueker.net/trainspotting/map.php?file=maps/kazakhstan---uzbekistan---kyrgyzstan---tajikstan/kazakhstan---uzbekistan---kyrgyzstan---tajikstan.gif web archive copy of Kazakhstan, Uzbekistan, Kyrgyzstan and Tajikstan map from the Railways Through Europe site], dated September 2009 | * Online: [https://web.archive.org/web/20230128200833/http://www.bueker.net/trainspotting/map.php?file=maps/kazakhstan---uzbekistan---kyrgyzstan---tajikstan/kazakhstan---uzbekistan---kyrgyzstan---tajikstan.gif web archive copy of Kazakhstan, Uzbekistan, Kyrgyzstan and Tajikstan map from the Railways Through Europe site], dated September 2009 | ||
* Tashkent [https://tashmetro.uz/wp-content/uploads/2024/08/toshkent-subway-mine-UZB2-with-QR-%D0%B1%D0%B5%D0%B7-%D1%80%D0%B5%D0%BA%D0%B8-%E2%80%94-EN.jpg Metro Map]. | |||
===Timetable=== | ===Timetable=== | ||
Line 14: | Line 15: | ||
Information is available at the [https://www.seat61.com/Uzbekistan.htm Man in Seat 61]. | Information is available at the [https://www.seat61.com/Uzbekistan.htm Man in Seat 61]. | ||
===Journey Planner=== | |||
[https://eticket.railway.uz/en/home Planner and Ticket purchase Link] | |||
<!-- | <!-- | ||
===Downloadable Timetable=== | ===Downloadable Timetable=== | ||
LINK | LINK | ||
Line 36: | Line 37: | ||
==Ticketing== | ==Ticketing== | ||
DETAILS | DETAILS | ||
--> | |||
==Infrastructure== | ==Infrastructure== | ||
At of March 2017, total length of main railway network; 4,700 km with some 2,450 km electrified. | |||
<!-- | |||
===Infrastructure Authority=== | ===Infrastructure Authority=== | ||
DETAILS | DETAILS | ||
Line 44: | Line 47: | ||
DETAILS (MAY NOT EXIST) | DETAILS (MAY NOT EXIST) | ||
--> | --> | ||
===Gauge=== | ===Gauge=== | ||
*Broad (1520 mm). | *Broad (1520 mm). | ||
Line 49: | Line 53: | ||
===Electrification=== | ===Electrification=== | ||
25 kV AC | *25 kV AC | ||
* Metro - 825 V dc - third rail | |||
* Tramways - 550 V dc | |||
<!-- | <!-- | ||
===Rule of the road=== | ===Rule of the road=== | ||
Line 63: | Line 69: | ||
DETAILS | DETAILS | ||
--> | --> | ||
==Metro and light rail systems== | ==Metro and light rail systems== | ||
Samarkand tramway | Tashkent/Toshkent Metro [https://tashmetro.uz/en/home-page/ Toshkent metropoliteni] operated by Uzbekistan Railways - 70 km. | ||
Samarkand/Samarqand tramway ~ 11 km. | |||
The Tashkent/Toshkent tramway closed in 2016 but there are plans, as of 2024, to re-open it. | |||
==Recent and Future Changes== | ==Recent and Future Changes== | ||
===Recent Changes=== | ===Recent Changes=== | ||
Samarkand tramway lines 1 and 2 resumed operation by 30 March 2025 | Samarkand/Samarqand tramway; lines 1 and 2 resumed operation by 30 March 2025 after suspension in January 2025. | ||
=== Future Changes=== | === Future Changes=== |
Latest revision as of 20:46, 18 May 2025
Country Details
See Wikipedia
Railway System
National Railway Operator
Uzbekistan Railways (Uzbek: Oʻzbekiston Temir Yoʻllari) are the national rail carrier.
Maps
- Online: web archive copy of Kazakhstan, Uzbekistan, Kyrgyzstan and Tajikstan map from the Railways Through Europe site, dated September 2009
- Tashkent Metro Map.
Timetable
- Printed: summary timetables are available in some editions of the European Rail Timetable.
Information is available at the Man in Seat 61.
Journey Planner
Planner and Ticket purchase Link
Infrastructure
At of March 2017, total length of main railway network; 4,700 km with some 2,450 km electrified.
Gauge
- Broad (1520 mm).
- Tramway systems are 1524 mm gauge.
Electrification
- 25 kV AC
- Metro - 825 V dc - third rail
- Tramways - 550 V dc
Metro and light rail systems
Tashkent/Toshkent Metro Toshkent metropoliteni operated by Uzbekistan Railways - 70 km.
Samarkand/Samarqand tramway ~ 11 km.
The Tashkent/Toshkent tramway closed in 2016 but there are plans, as of 2024, to re-open it.
Recent and Future Changes
Recent Changes
Samarkand/Samarqand tramway; lines 1 and 2 resumed operation by 30 March 2025 after suspension in January 2025.
Future Changes
Lines with Obscure or Sparse passenger services
None known.