Côte d'Ivoire: Difference between revisions

Jump to navigationJump to search
page created
 
 
(12 intermediate revisions by 3 users not shown)
Line 1: Line 1:
==Country Details==
==Country Details==
See [https://en.wikipedia.org/wiki/Ivory_Coast Wikipedia]
See [https://en.wikipedia.org/wiki/Ivory_Coast Wikipedia]
<!--
==National Railway System==
===National Railway Operator===
DETAILS
-->
==Timetable==
* Online: unofficial timetable information is available at [https://www.fahrplancenter.com/Sitarail.html Fahrplancenter]. Note that this may be substantially out of date.
* Printed: summary timetables are available in some editions of the [[Links#ERT | European Rail Timetable]].
<!--
===Journey Planner===
LINK


===Downloadable Timetable===
==Railway System==
LINK
The railway system consists of a single railway, which links Abidjan with Ouagadougou, in Burkina Faso. It is currently operated by [https://fr.wikipedia.org/wiki/Sitarail Sitarail], a private company, under contract to the Côte d'Ivoire and Burkina Faso governments.
 
See also [https://www.sinfin.net/railways/world/ivoire.html Railways in Côte d’Ivoire] description at sinfin.net.
 
===Infrastructure===
===Gauge===
 
* Metre (660 km).


===Printed Timetable===
===Electrification===
DETAILS
* None


===Engineering Information===
===Rule of the road===
LINK
* Not known; probably single throughout
 
===Timetable===
There does not appear to be a Sitarail website.
* Online: unofficial timetable information is available at [https://www.fahrplancenter.com/Sitarail.html Fahrplancenter]. Note that this may be substantially out of date.
* Printed: summary timetables are available in some editions of the [[Links#ERT | European Rail Timetable]].


==Maps==
==Maps==
<!--
===Printed Maps===
===Printed Maps===
DETAILS
DETAILS
 
-->
===Web-based Maps===
===Web-based Maps===
DETAILS
[https://fr.wikipedia.org/wiki/Sch%C3%A9ma_de_la_ligne_d%27Abidjan_%C3%A0_Ouagadougou Abidjan-Ouagadougou railway].
 
<!--
==Ticketing==
==Ticketing==
DETAILS
DETAILS
 
-->
==Infrastructure==
===Infrastructure Authority===
DETAILS
 
===Network Statement===
DETAILS (MAY NOT EXIST)
 
===Gauge===
DETAILS
 
===Electrification===
DETAILS
 
===Rule of the road===
DETAILS
 
===Distances===
DETAILS


==Other Railways==
==Other Railways==
DETAILS
None known


==Tourist Lines==
==Tourist Lines==
DETAILS
None known
 
==Metros==
DETAILS


==Trams==
==Metro and light rail systems==
DETAILS
===Abidjan===
A 38 km standard gauge [https://www.lemetrodabidjan.ci/ metro system] is under construction; it may be opened in 2028. See also [https://fr.wikipedia.org/wiki/M%C3%A9tro_d%27Abidjan Wikipedia (French language)].


==Recent and Future Changes==
==Recent and Future Changes==
===Recent Changes===
===Recent Changes===
Renovating the 1,260-kilometre of line through to Burkina Faso, which had first been announced in 2015, started 4 December 2022 and is expected to take eight years.
<!--
=== Future Changes===
DETAILS
DETAILS


=== Future Changes===
DETAILS
-->
==Obscure and Sparse Passenger Services==
None known
<!--
==Special Notes==
==Special Notes==
DETAILS
DETAILS
-->
-->
==Lines with Obscure or Sparse passenger services==
None known.
[[Category:Countries in Africa]][[Category:Countries]]
[[Category:Countries in Africa]][[Category:Countries]]

Latest revision as of 22:54, 1 December 2024

Country Details

See Wikipedia

Railway System

The railway system consists of a single railway, which links Abidjan with Ouagadougou, in Burkina Faso. It is currently operated by Sitarail, a private company, under contract to the Côte d'Ivoire and Burkina Faso governments.

See also Railways in Côte d’Ivoire description at sinfin.net.

Infrastructure

Gauge

  • Metre (660 km).

Electrification

  • None

Rule of the road

  • Not known; probably single throughout

Timetable

There does not appear to be a Sitarail website.

  • Online: unofficial timetable information is available at Fahrplancenter. Note that this may be substantially out of date.
  • Printed: summary timetables are available in some editions of the European Rail Timetable.

Maps

Web-based Maps

Abidjan-Ouagadougou railway.

Other Railways

None known

Tourist Lines

None known

Metro and light rail systems

Abidjan

A 38 km standard gauge metro system is under construction; it may be opened in 2028. See also Wikipedia (French language).

Recent and Future Changes

Recent Changes

Renovating the 1,260-kilometre of line through to Burkina Faso, which had first been announced in 2015, started 4 December 2022 and is expected to take eight years.

Lines with Obscure or Sparse passenger services

None known.