Uzbekistan: Difference between revisions
Jump to navigationJump to search
Mark Waller (talk | contribs) page created |
→Metro and light rail systems: Tashkent/Toshkent tramway |
||
(28 intermediate revisions by 3 users not shown) | |||
Line 1: | Line 1: | ||
==Country Details== | ==Country Details== | ||
See [https://en.wikipedia.org/wiki/Uzbekistan Wikipedia] | See [https://en.wikipedia.org/wiki/Uzbekistan Wikipedia] | ||
== | ==Railway System== | ||
===National Railway Operator=== | ===National Railway Operator=== | ||
Uzbekistan Railways (Uzbek: Oʻzbekiston Temir Yoʻllari) are the national rail carrier. | |||
-- | |||
==Timetable== | ===Maps=== | ||
* Online: [https://web.archive.org/web/20230128200833/http://www.bueker.net/trainspotting/map.php?file=maps/kazakhstan---uzbekistan---kyrgyzstan---tajikstan/kazakhstan---uzbekistan---kyrgyzstan---tajikstan.gif web archive copy of Kazakhstan, Uzbekistan, Kyrgyzstan and Tajikstan map from the Railways Through Europe site], dated September 2009 | |||
* Tashkent [https://tashmetro.uz/wp-content/uploads/2024/08/toshkent-subway-mine-UZB2-with-QR-%D0%B1%D0%B5%D0%B7-%D1%80%D0%B5%D0%BA%D0%B8-%E2%80%94-EN.jpg Metro Map]. | |||
===Timetable=== | |||
* Printed: summary timetables are available in some editions of the [[Links#ERT | European Rail Timetable]]. | * Printed: summary timetables are available in some editions of the [[Links#ERT | European Rail Timetable]]. | ||
Information is available at the [https://www.seat61.com/Uzbekistan.htm Man in Seat 61]. | Information is available at the [https://www.seat61.com/Uzbekistan.htm Man in Seat 61]. | ||
===Journey Planner=== | |||
[https://eticket.railway.uz/en/home Planner and Ticket purchase Link] | |||
<!-- | <!-- | ||
===Downloadable Timetable=== | ===Downloadable Timetable=== | ||
LINK | LINK | ||
Line 32: | Line 37: | ||
==Ticketing== | ==Ticketing== | ||
DETAILS | DETAILS | ||
--> | |||
==Infrastructure== | ==Infrastructure== | ||
At of March 2017, total length of main railway network; 4,700 km with some 2,450 km electrified. | |||
<!-- | |||
===Infrastructure Authority=== | ===Infrastructure Authority=== | ||
DETAILS | DETAILS | ||
Line 39: | Line 46: | ||
===Network Statement=== | ===Network Statement=== | ||
DETAILS (MAY NOT EXIST) | DETAILS (MAY NOT EXIST) | ||
--> | |||
===Gauge=== | ===Gauge=== | ||
*Broad (1520 mm). | |||
*Tramway systems are 1524 mm gauge. | |||
===Electrification=== | ===Electrification=== | ||
*25 kV AC | |||
* Metro - 825 V dc - third rail | |||
* Tramways - 550 V dc | |||
<!-- | |||
===Rule of the road=== | ===Rule of the road=== | ||
DETAILS | DETAILS | ||
Line 57: | Line 68: | ||
==Tourist Lines== | ==Tourist Lines== | ||
DETAILS | DETAILS | ||
--> | |||
==Metro and light rail systems== | ==Metro and light rail systems== | ||
Tashkent/Toshkent Metro [https://tashmetro.uz/en/home-page/ Toshkent metropoliteni] operated by Uzbekistan Railways - 70 km. | |||
Samarkand/Samarqand tramway ~ 11 km. | |||
The Tashkent/Toshkent tramway closed in 2016 but there are plans, as of 2024, to re-open it. | |||
==Recent and Future Changes== | ==Recent and Future Changes== | ||
===Recent Changes=== | ===Recent Changes=== | ||
Samarkand/Samarqand tramway; lines 1 and 2 resumed operation by 30 March 2025 after suspension in January 2025. | |||
=== Future Changes=== | === Future Changes=== | ||
<!-- | <!-- | ||
==Special Notes== | ==Special Notes== | ||
DETAILS | DETAILS | ||
--> | --> | ||
==Lines with Obscure or Sparse passenger services== | |||
None known. | |||
[[Category:Countries in Asia]][[Category:Countries]] | [[Category:Countries in Asia]][[Category:Countries]] |
Latest revision as of 20:46, 18 May 2025
Country Details
See Wikipedia
Railway System
National Railway Operator
Uzbekistan Railways (Uzbek: Oʻzbekiston Temir Yoʻllari) are the national rail carrier.
Maps
- Online: web archive copy of Kazakhstan, Uzbekistan, Kyrgyzstan and Tajikstan map from the Railways Through Europe site, dated September 2009
- Tashkent Metro Map.
Timetable
- Printed: summary timetables are available in some editions of the European Rail Timetable.
Information is available at the Man in Seat 61.
Journey Planner
Planner and Ticket purchase Link
Infrastructure
At of March 2017, total length of main railway network; 4,700 km with some 2,450 km electrified.
Gauge
- Broad (1520 mm).
- Tramway systems are 1524 mm gauge.
Electrification
- 25 kV AC
- Metro - 825 V dc - third rail
- Tramways - 550 V dc
Metro and light rail systems
Tashkent/Toshkent Metro Toshkent metropoliteni operated by Uzbekistan Railways - 70 km.
Samarkand/Samarqand tramway ~ 11 km.
The Tashkent/Toshkent tramway closed in 2016 but there are plans, as of 2024, to re-open it.
Recent and Future Changes
Recent Changes
Samarkand/Samarqand tramway; lines 1 and 2 resumed operation by 30 March 2025 after suspension in January 2025.
Future Changes
Lines with Obscure or Sparse passenger services
None known.