Philippines: Difference between revisions
→Future Changes: no Naga-Legazpi service increase start dates |
→Recent and Future Changes: Governor Pascual-Tutuban and Tutuban-Alabang operation stopped 28 March 2024 to assist in NSCR construction. |
||
Line 81: | Line 81: | ||
On 27 December 2023, after more than six years, PNR trains ran on the 101-kilometer Naga-Legazpi-Naga route in the Bicol Region again. | On 27 December 2023, after more than six years, PNR trains ran on the 101-kilometer Naga-Legazpi-Naga route in the Bicol Region again. | ||
The line from Tutuban to Alabang will be closed for an estimated 5 years for rebuilding/electrification from 27/28 March 2024. | In addition PNR halted its Governor Pascual-Tutuban operations from 28 March 2024 to "accelerate" the construction of the North-South Commuter Railway (NSCR). | ||
The line from Tutuban to Alabang will be closed for an estimated 5 years for rebuilding/electrification from 27/28 March 2024 as well as to "accelerate" the construction of the North-South Commuter Railway (NSCR).. | |||
Construction of the 148 km Standard Gauge [https://nscr.com.ph/ North-South Commuter Railway} (NSCR) started in 2019, with a first projected partial opening in 2028 and full opening in 2031. | Construction of the 148 km Standard Gauge [https://nscr.com.ph/ North-South Commuter Railway} (NSCR) started in 2019, with a first projected partial opening in 2028 and full opening in 2031. |
Revision as of 14:51, 16 October 2024
Country Details
See Wikipedia
Railway System
National Railway Operator
Philippine National Railways (PNR)
Maps
Timetable
Refer to PNR Facebook Page for latest timetabled departures.
Information is available at the Man in Seat 61.
Gauge
- 1067 mm (3 feet 6 inches)
- 1435 mm (4 feet 8½ inches) Standard; For Manila LRT and MRT
Electrification
Manila LRT and MRT; 750 V DC and 1,500 V DC.
Metro and light rail systems
Manila Light Rapid Transit and Mass Rapid Transit.
- Light Rail Transit Authority (LRT).
- Mass Rapid Transit (MRT)
See also Urban Rail Site.
Recent and Future Changes
Recent Changes
On 27 December 2023, after more than six years, PNR trains ran on the 101-kilometer Naga-Legazpi-Naga route in the Bicol Region again.
In addition PNR halted its Governor Pascual-Tutuban operations from 28 March 2024 to "accelerate" the construction of the North-South Commuter Railway (NSCR).
The line from Tutuban to Alabang will be closed for an estimated 5 years for rebuilding/electrification from 27/28 March 2024 as well as to "accelerate" the construction of the North-South Commuter Railway (NSCR)..
Construction of the 148 km Standard Gauge [https://nscr.com.ph/ North-South Commuter Railway} (NSCR) started in 2019, with a first projected partial opening in 2028 and full opening in 2031.
Future Changes
On 7 October 2024 it was announced that Naga-Legazpi services would be increased from 2 to 3 trains a day but without any obvious start date.
Obscure and Sparse Passenger Services
None known