Angola: Difference between revisions
Jump to navigationJump to search
→Future Changes: Luanda Metro construction in 2025 |
→Future Changes: Luanda Surface Metro System (MSL) |
||
Line 69: | Line 69: | ||
--> | --> | ||
=== Future Changes=== | === Future Changes=== | ||
The first phase of the Luanda Surface Metro System (MSL) has been approved, for the capital Luanda, with construction of 60 km of line scheduled to start in 2025. | |||
==Lines with Obscure or Sparse Passenger Services== | ==Lines with Obscure or Sparse Passenger Services== |
Revision as of 19:26, 18 November 2024
Country Details
See Wikipedia
Timetable
- Online: unofficial timetable information is available at Fahrplancenter. Note that this may be substantially out of date.
- Printed: summary timetables are available in some editions of the European Rail Timetable.
Recent and Future Changes
Future Changes
The first phase of the Luanda Surface Metro System (MSL) has been approved, for the capital Luanda, with construction of 60 km of line scheduled to start in 2025.
Lines with Obscure or Sparse Passenger Services
See Angola - Lines with Obscure or Sparse passenger services.