Angola: Difference between revisions

Jump to navigationJump to search
Future Changes: Luanda Surface Metro System (MSL)
Timetable: open metros section
Line 56: Line 56:
==Tourist Lines==
==Tourist Lines==
DETAILS
DETAILS
 
-->
==Metros==
==Metros==
DETAILS
DETAILS
 
<!--
==Trams==
==Trams==
DETAILS
DETAILS
-->
-->
==Recent and Future Changes==
==Recent and Future Changes==
<!--
<!--

Revision as of 19:29, 18 November 2024

Country Details

See Wikipedia

Timetable

  • Online: unofficial timetable information is available at Fahrplancenter. Note that this may be substantially out of date.
  • Printed: summary timetables are available in some editions of the European Rail Timetable.

Metros

DETAILS

Recent and Future Changes

Future Changes

The first phase of the Luanda Surface Metro System (MSL) has been approved, for the capital Luanda, with construction of 60 km of line scheduled to start in 2025.

Lines with Obscure or Sparse Passenger Services

See Angola - Lines with Obscure or Sparse passenger services.

See also