Uruguay: Difference between revisions
Jump to navigationJump to search
Paul Griffin (talk | contribs) |
Paul Griffin (talk | contribs) |
||
Line 82: | Line 82: | ||
==Recent and Future Changes== | ==Recent and Future Changes== | ||
===Recent Changes=== | ===Recent Changes=== | ||
The Ferrocarril Central Railroad project in Uruguay rehabilitated and constructed a 273km railway line connecting the capital city of Montevideo with the city of Paso de los Toros. The railway line became operational in April 2024. | |||
=== Future Changes=== | === Future Changes=== |
Revision as of 21:34, 19 November 2024
Country Details
See Wikipedia
Timetable
- Online: official timetable information is available at Administración de Ferrocarriles del Estado
- Online: unofficial timetable information is available at Fahrplancenter. Note that this may be out of date.
- Printed: summary timetables are available in some editions of the European Rail Timetable.
Some information is available at the Man in Seat 61.
Maps
Engineering Information
Uruguay Central Railroad project
Lines with Obscure or Sparse passenger services
See Uruguay - Lines with Obscure or Sparse passenger services.
Recent and Future Changes
Recent Changes
The Ferrocarril Central Railroad project in Uruguay rehabilitated and constructed a 273km railway line connecting the capital city of Montevideo with the city of Paso de los Toros. The railway line became operational in April 2024.