Uzbekistan: Difference between revisions
Jump to navigationJump to search
→Electrification: 25 kV ac |
→Railway System: open metro LRT and R+FC |
||
Line 62: | Line 62: | ||
==Tourist Lines== | ==Tourist Lines== | ||
DETAILS | DETAILS | ||
--> | |||
==Metro and light rail systems== | ==Metro and light rail systems== | ||
DETAILS | DETAILS | ||
Line 71: | Line 71: | ||
=== Future Changes=== | === Future Changes=== | ||
<!-- | |||
==Special Notes== | ==Special Notes== |
Revision as of 19:39, 18 May 2025
Country Details
See Wikipedia
Railway System
Maps
- Online: web archive copy of Kazakhstan, Uzbekistan, Kyrgyzstan and Tajikstan map from the Railways Through Europe site, dated September 2009
Timetable
- Printed: summary timetables are available in some editions of the European Rail Timetable.
Information is available at the Man in Seat 61.
Gauge
- Broad (1520 mm).
- Tramway systems are 1524 mm gauge.
Electrification
25 kV AC
Metro and light rail systems
DETAILS
Recent and Future Changes
Recent Changes
DETAILS
Future Changes
Lines with Obscure or Sparse passenger services
None known.