Uzbekistan: Difference between revisions
Jump to navigationJump to search
→Metro and light rail systems: Samarkand tramway |
→Recent Changes: Samarkand tramway operating again by 3/2025 |
||
Line 68: | Line 68: | ||
==Recent and Future Changes== | ==Recent and Future Changes== | ||
===Recent Changes=== | ===Recent Changes=== | ||
Samarkand tramway lines 1 and 2 resumed operation by 30 March 2025 | |||
=== Future Changes=== | === Future Changes=== |
Revision as of 19:43, 18 May 2025
Country Details
See Wikipedia
Railway System
Maps
- Online: web archive copy of Kazakhstan, Uzbekistan, Kyrgyzstan and Tajikstan map from the Railways Through Europe site, dated September 2009
Timetable
- Printed: summary timetables are available in some editions of the European Rail Timetable.
Information is available at the Man in Seat 61.
Gauge
- Broad (1520 mm).
- Tramway systems are 1524 mm gauge.
Electrification
25 kV AC
Metro and light rail systems
Samarkand tramway
Recent and Future Changes
Recent Changes
Samarkand tramway lines 1 and 2 resumed operation by 30 March 2025
Future Changes
Lines with Obscure or Sparse passenger services
None known.