Uzbekistan: Difference between revisions
Jump to navigationJump to search
→Metro and light rail systems: Samarqand |
|||
Line 73: | Line 73: | ||
==Recent and Future Changes== | ==Recent and Future Changes== | ||
===Recent Changes=== | ===Recent Changes=== | ||
Samarkand tramway lines 1 and 2 resumed operation by 30 March 2025 | Samarkand/Samarqand tramway lines 1 and 2 resumed operation by 30 March 2025 | ||
=== Future Changes=== | === Future Changes=== |
Revision as of 19:51, 18 May 2025
Country Details
See Wikipedia
Railway System
Maps
- Online: web archive copy of Kazakhstan, Uzbekistan, Kyrgyzstan and Tajikstan map from the Railways Through Europe site, dated September 2009
- Tashkent Metro Map.
Timetable
- Printed: summary timetables are available in some editions of the European Rail Timetable.
Information is available at the Man in Seat 61.
Gauge
- Broad (1520 mm).
- Tramway systems are 1524 mm gauge.
Electrification
- 25 kV AC
- Tramways - 550 V dc
Metro and light rail systems
Samarkand/Samarqand tramway
Recent and Future Changes
Recent Changes
Samarkand/Samarqand tramway lines 1 and 2 resumed operation by 30 March 2025
Future Changes
Lines with Obscure or Sparse passenger services
None known.