Uzbekistan: Difference between revisions

Jump to navigationJump to search
Recent Changes: lines 1 and 2 resumed operation by 30 March 2025 after suspension in January 2025.
Electrification: metro - 825 V dc - third rail
Line 51: Line 51:
===Electrification===
===Electrification===
*25 kV AC
*25 kV AC
* Metro - 825 V dc - third rail
* Tramways - 550 V dc
* Tramways - 550 V dc
<!--
<!--

Revision as of 20:02, 18 May 2025

Country Details

See Wikipedia

Railway System

Maps

Timetable

Information is available at the Man in Seat 61.

Gauge

  • Broad (1520 mm).
  • Tramway systems are 1524 mm gauge.

Electrification

  • 25 kV AC
  • Metro - 825 V dc - third rail
  • Tramways - 550 V dc

Metro and light rail systems

Tashkent Metro.

Samarkand/Samarqand tramway ~ 11 km.

Recent and Future Changes

Recent Changes

Samarkand/Samarqand tramway; lines 1 and 2 resumed operation by 30 March 2025 after suspension in January 2025.

Future Changes

Lines with Obscure or Sparse passenger services

None known.