Uzbekistan: Difference between revisions
Jump to navigationJump to search
m →Metro and light rail systems: Tashkent/Toshkent |
→Metro and light rail systems: Tashkent/Toshkent metro 70 km |
||
Line 68: | Line 68: | ||
==Metro and light rail systems== | ==Metro and light rail systems== | ||
[https://tashmetro.uz/en/home-page/ Tashkent/Toshkent Metro]. | [https://tashmetro.uz/en/home-page/ Tashkent/Toshkent Metro] - 70 km. | ||
Samarkand/Samarqand tramway ~ 11 km. | Samarkand/Samarqand tramway ~ 11 km. |
Revision as of 20:05, 18 May 2025
Country Details
See Wikipedia
Railway System
Maps
- Online: web archive copy of Kazakhstan, Uzbekistan, Kyrgyzstan and Tajikstan map from the Railways Through Europe site, dated September 2009
- Tashkent Metro Map.
Timetable
- Printed: summary timetables are available in some editions of the European Rail Timetable.
Information is available at the Man in Seat 61.
Gauge
- Broad (1520 mm).
- Tramway systems are 1524 mm gauge.
Electrification
- 25 kV AC
- Metro - 825 V dc - third rail
- Tramways - 550 V dc
Metro and light rail systems
Tashkent/Toshkent Metro - 70 km.
Samarkand/Samarqand tramway ~ 11 km.
Recent and Future Changes
Recent Changes
Samarkand/Samarqand tramway; lines 1 and 2 resumed operation by 30 March 2025 after suspension in January 2025.
Future Changes
Lines with Obscure or Sparse passenger services
None known.