Uzbekistan: Difference between revisions

Jump to navigationJump to search
Metro and light rail systems: metro operated by Uzbekistan Railways
Line 71: Line 71:


==Metro and light rail systems==
==Metro and light rail systems==
Tashkent/Toshkent Metro [https://tashmetro.uz/en/home-page/ Toshkent metropoliteni] - 70 km.
Tashkent/Toshkent Metro [https://tashmetro.uz/en/home-page/ Toshkent metropoliteni] operated by Uzbekistan Railways - 70 km.


Samarkand/Samarqand tramway ~ 11 km.
Samarkand/Samarqand tramway ~ 11 km.

Revision as of 20:25, 18 May 2025

Country Details

See Wikipedia

Railway System

National Railway Operator

Uzbekistan Railways (Uzbek: Oʻzbekiston Temir Yoʻllari) are the national rail carrier.

Maps

Timetable

Information is available at the Man in Seat 61.

Journey Planner

Planner and Ticket purchase Link

Infrastructure

At of March 2017, total length of main railway network; 4,670 km with some 2,450 km electrified.

Gauge

  • Broad (1520 mm).
  • Tramway systems are 1524 mm gauge.

Electrification

  • 25 kV AC
  • Metro - 825 V dc - third rail
  • Tramways - 550 V dc

Metro and light rail systems

Tashkent/Toshkent Metro Toshkent metropoliteni operated by Uzbekistan Railways - 70 km.

Samarkand/Samarqand tramway ~ 11 km.

Recent and Future Changes

Recent Changes

Samarkand/Samarqand tramway; lines 1 and 2 resumed operation by 30 March 2025 after suspension in January 2025.

Future Changes

Lines with Obscure or Sparse passenger services

None known.