Philippines: Difference between revisions
Jump to navigationJump to search
m →Recent Changes: tidy up |
→Railway System: add gauge and electrification |
||
Line 41: | Line 41: | ||
===Network Statement=== | ===Network Statement=== | ||
DETAILS (MAY NOT EXIST) | DETAILS (MAY NOT EXIST) | ||
--> | |||
===Gauge=== | ===Gauge=== | ||
* 1067 mm (3 feet 6 inches) | |||
===Electrification=== | ===Electrification=== | ||
None | |||
<!-- | |||
===Rule of the road=== | ===Rule of the road=== | ||
DETAILS | DETAILS |
Revision as of 10:44, 8 October 2024
Country Details
See Wikipedia
Railway System
National Railway Operator
Philippine National Railways (PNR)
Maps
- Online: Railways Through Europe
Timetable
Information is available at the Man in Seat 61.
Gauge
- 1067 mm (3 feet 6 inches)
Electrification
None
Obscure and Sparse Passenger Services
None known
Recent Changes
On 27 December 2023, after more than six years, PNR trains ran on the 101-kilometer Naga-Legazpi-Naga route in the Bicol Region again.
The line from Tutuban to Alabang will be closed for an estimated 5 years for rebuilding/electrification from 27/28 March 2024