Angola: Difference between revisions

Jump to navigationJump to search
Timetable: open infrastructure + gauge
Line 31: Line 31:
==Ticketing==
==Ticketing==
DETAILS
DETAILS
 
-->
==Infrastructure==
==Infrastructure==
<!--
===Infrastructure Authority===
===Infrastructure Authority===
DETAILS
DETAILS
Line 38: Line 39:
===Network Statement===
===Network Statement===
DETAILS (MAY NOT EXIST)
DETAILS (MAY NOT EXIST)
 
-->
===Gauge===
===Gauge===
DETAILS
DETAILS
 
<!--
===Electrification===
===Electrification===
DETAILS
DETAILS
Line 57: Line 58:
DETAILS
DETAILS
-->
-->
==Metros==
==Metros==
A four line metro system is planned for Luanda [with yellow, red, blue and green lines], with construction of the first 60 km approved to start in 2025.  
A four line metro system is planned for Luanda [with yellow, red, blue and green lines], with construction of the first 60 km approved to start in 2025.  

Revision as of 19:39, 18 November 2024

Country Details

See Wikipedia

Timetable

  • Online: unofficial timetable information is available at Fahrplancenter. Note that this may be substantially out of date.
  • Printed: summary timetables are available in some editions of the European Rail Timetable.

Infrastructure

Gauge

DETAILS

Metros

A four line metro system is planned for Luanda [with yellow, red, blue and green lines], with construction of the first 60 km approved to start in 2025.

Recent and Future Changes

Future Changes

The first phase of the Luanda Surface Metro System (MSL) has been approved, for the capital Luanda, with construction of 60 km of the yellow line scheduled to start in 2025.

Lines with Obscure or Sparse Passenger Services

See Angola - Lines with Obscure or Sparse passenger services.

See also