Timetable: open infrastructure + gauge
Line 41: Line 41:
-->
-->
===Gauge===
===Gauge===
DETAILS
1,067 mm (3 foot 6 inches) Cape Gauge
<!--
<!--
===Electrification===
===Electrification===

Revision as of 19:43, 18 November 2024

Country Details

See Wikipedia

Timetable

  • Online: unofficial timetable information is available at Fahrplancenter. Note that this may be substantially out of date.
  • Printed: summary timetables are available in some editions of the European Rail Timetable.

Infrastructure

Gauge

1,067 mm (3 foot 6 inches) Cape Gauge

Metros

A four line metro system is planned for Luanda [with yellow, red, blue and green lines], with construction of the first 60 km approved to start in 2025.

Recent and Future Changes

Future Changes

The first phase of the Luanda Surface Metro System (MSL) has been approved, for the capital Luanda, with construction of 60 km of the yellow line scheduled to start in 2025.

Lines with Obscure or Sparse Passenger Services

See Angola - Lines with Obscure or Sparse passenger services.