Gabon: Difference between revisions
Jump to navigationJump to search
m →Timetable: 24 sept. 2024 |
→National Railway Operator: add sinfin link |
||
Line 8: | Line 8: | ||
Société d'Exploitation du Transgabonais (SETRAG) was awarded a 20 year concession in 1999. | Société d'Exploitation du Transgabonais (SETRAG) was awarded a 20 year concession in 1999. | ||
See [https://www.sinfin.net/railways/world/gabon.html Railways in Gabon] description at sinfin.net. | |||
==Timetable== | ==Timetable== |
Latest revision as of 22:15, 1 December 2024
Country Details
See Wikipedia -->
National Railway System
National Railway Operator
Gabon State Railways (OCTRA).
Société d'Exploitation du Transgabonais (SETRAG) was awarded a 20 year concession in 1999.
See Railways in Gabon description at sinfin.net.
Timetable
- Online: unofficial timetable information is available at Fahrplancenter. Note that this may be out of date.
- Printed: summary timetables are available in some editions of the European Rail Timetable.
Information is available at the Man in Seat 61.
Train times at the SETRAG. site (as at 24 September 2024).
Infrastructure
The Trans-Gabon Railway (French: Transgabonais) is the only railway in Gabon. It runs east from Owendo port station, in Libreville, to Franceville.
Gauge
- 1,435 mm (4 foot 8 +1⁄2 inch) Standard (970 km).
Electrification
- None
Rule of the road
- Not know - probably single throughout.
Lines with Obscure or Sparse passenger services
None known.