Uzbekistan: Difference between revisions

Jump to navigationJump to search
Recent Changes: Samarkand tramway operating again by 3/2025
Line 68: Line 68:
==Recent and Future Changes==
==Recent and Future Changes==
===Recent Changes===
===Recent Changes===
DETAILS
Samarkand tramway lines 1 and 2 resumed operation by 30 March 2025


=== Future Changes===
=== Future Changes===

Revision as of 19:43, 18 May 2025

Country Details

See Wikipedia

Railway System

Maps

Timetable

Information is available at the Man in Seat 61.

Gauge

  • Broad (1520 mm).
  • Tramway systems are 1524 mm gauge.

Electrification

25 kV AC

Metro and light rail systems

Samarkand tramway

Recent and Future Changes

Recent Changes

Samarkand tramway lines 1 and 2 resumed operation by 30 March 2025

Future Changes

Lines with Obscure or Sparse passenger services

None known.