Uzbekistan: Difference between revisions
Jump to navigationJump to search
→Recent Changes: Samarkand tramway operating again by 3/2025 |
→Electrification: add trams |
||
Line 49: | Line 49: | ||
===Electrification=== | ===Electrification=== | ||
25 kV AC | *25 kV AC | ||
* Tramways - 550 V dc | |||
<!-- | <!-- | ||
===Rule of the road=== | ===Rule of the road=== | ||
Line 63: | Line 64: | ||
DETAILS | DETAILS | ||
--> | --> | ||
==Metro and light rail systems== | ==Metro and light rail systems== | ||
Samarkand tramway | Samarkand tramway |
Revision as of 19:45, 18 May 2025
Country Details
See Wikipedia
Railway System
Maps
- Online: web archive copy of Kazakhstan, Uzbekistan, Kyrgyzstan and Tajikstan map from the Railways Through Europe site, dated September 2009
Timetable
- Printed: summary timetables are available in some editions of the European Rail Timetable.
Information is available at the Man in Seat 61.
Gauge
- Broad (1520 mm).
- Tramway systems are 1524 mm gauge.
Electrification
- 25 kV AC
- Tramways - 550 V dc
Metro and light rail systems
Samarkand tramway
Recent and Future Changes
Recent Changes
Samarkand tramway lines 1 and 2 resumed operation by 30 March 2025
Future Changes
Lines with Obscure or Sparse passenger services
None known.