Uzbekistan: Difference between revisions
Jump to navigationJump to search
→Recent Changes: lines 1 and 2 resumed operation by 30 March 2025 after suspension in January 2025. |
→Electrification: metro - 825 V dc - third rail |
||
Line 51: | Line 51: | ||
===Electrification=== | ===Electrification=== | ||
*25 kV AC | *25 kV AC | ||
* Metro - 825 V dc - third rail | |||
* Tramways - 550 V dc | * Tramways - 550 V dc | ||
<!-- | <!-- |
Revision as of 20:02, 18 May 2025
Country Details
See Wikipedia
Railway System
Maps
- Online: web archive copy of Kazakhstan, Uzbekistan, Kyrgyzstan and Tajikstan map from the Railways Through Europe site, dated September 2009
- Tashkent Metro Map.
Timetable
- Printed: summary timetables are available in some editions of the European Rail Timetable.
Information is available at the Man in Seat 61.
Gauge
- Broad (1520 mm).
- Tramway systems are 1524 mm gauge.
Electrification
- 25 kV AC
- Metro - 825 V dc - third rail
- Tramways - 550 V dc
Metro and light rail systems
Samarkand/Samarqand tramway ~ 11 km.
Recent and Future Changes
Recent Changes
Samarkand/Samarqand tramway; lines 1 and 2 resumed operation by 30 March 2025 after suspension in January 2025.
Future Changes
Lines with Obscure or Sparse passenger services
None known.