Uganda: Difference between revisions
Jump to navigationJump to search
Geoff Egtrow (talk | contribs) (Create skeleton page) |
Geoff Egtrow (talk | contribs) (Reconstruction work) |
||
(2 intermediate revisions by the same user not shown) | |||
Line 1: | Line 1: | ||
==Country Details== | ==Country Details== | ||
See [https://en.wikipedia.org/wiki/Uganda Wikipedia] | See [https://en.wikipedia.org/wiki/Uganda Wikipedia] | ||
==National Railway System== | ==National Railway System== | ||
===National Railway Operator=== | ===National Railway Operator=== | ||
[https://urc.go.ug/ Uganda Railways Corporation] | |||
==Timetable== | ==Timetable== | ||
* Online: | * Online: [https://urc.go.ug/service/passenger-services/ Passenger Services]. Note that this is described as a "Tentative Passenger Train Time Schedule"! | ||
* Printed: summary timetables are available in some editions of the [[Links#ERT | European Rail Timetable]]. | * Printed: summary timetables are available in some editions of the [[Links#ERT | European Rail Timetable]]. | ||
<!-- | <!-- | ||
===Journey Planner=== | ===Journey Planner=== | ||
Line 41: | Line 40: | ||
===Network Statement=== | ===Network Statement=== | ||
DETAILS (MAY NOT EXIST) | DETAILS (MAY NOT EXIST) | ||
--> | |||
===Gauge=== | ===Gauge=== | ||
Metre gauge | |||
===Electrification=== | ===Electrification=== | ||
None | |||
<!-- | |||
===Rule of the road=== | ===Rule of the road=== | ||
DETAILS | DETAILS | ||
Line 65: | Line 64: | ||
==Trams== | ==Trams== | ||
DETAILS | DETAILS | ||
--> | |||
==Recent and Future Changes== | ==Recent and Future Changes== | ||
===Recent Changes=== | ===Recent Changes=== | ||
Emergency rehabilitation work on the line from Tororo, near the Kenyan border, to Mukono (near Kampala) has been completed. Work on the Mukono - Kampala section started in April 2023. | |||
=== Future Changes=== | === Future Changes=== | ||
Reconstruction work, lasting about two years, has started on the 382 km line from Tororo to Gulu, in the north west. This has had no traffic for about 30 years. It is planned to introduce a passenger service and to transport at least 500,000 tonnes of freight by 2025-26. | |||
- | |||
==Obscure and Sparse Passenger Services== | ==Obscure and Sparse Passenger Services== | ||
None known - the compilers would be grateful for any updates. | None known - the compilers would be grateful for any updates. |
Latest revision as of 10:24, 15 September 2023
Country Details
See Wikipedia
National Railway System
National Railway Operator
Timetable
- Online: Passenger Services. Note that this is described as a "Tentative Passenger Train Time Schedule"!
- Printed: summary timetables are available in some editions of the European Rail Timetable.
Gauge
Metre gauge
Electrification
None
Recent and Future Changes
Recent Changes
Emergency rehabilitation work on the line from Tororo, near the Kenyan border, to Mukono (near Kampala) has been completed. Work on the Mukono - Kampala section started in April 2023.
Future Changes
Reconstruction work, lasting about two years, has started on the 382 km line from Tororo to Gulu, in the north west. This has had no traffic for about 30 years. It is planned to introduce a passenger service and to transport at least 500,000 tonnes of freight by 2025-26.
Obscure and Sparse Passenger Services
None known - the compilers would be grateful for any updates.