==Country Details==
==Country Details==
See [https://en.wikipedia.org/wiki/Uganda Wikipedia]
See [https://en.wikipedia.org/wiki/Uganda Wikipedia]
<!--
 
==National Railway System==
==National Railway System==
===National Railway Operator===
===National Railway Operator===
DETAILS
[https://urc.go.ug/ Uganda Railways Corporation]
-->
 
==Timetable==
==Timetable==
* Online: unofficial timetable information is available at [https://www.fahrplancenter.com/BotswanaTT.html Fahrplancenter]. Note that this may be out of date.
* Online: [https://urc.go.ug/service/passenger-services/ Passenger Services]. Note that this is described as a "Tentative Passenger Train Time Schedule"!
* Printed: summary timetables are available in some editions of the [[Links#ERT | European Rail Timetable]].
* Printed: summary timetables are available in some editions of the [[Links#ERT | European Rail Timetable]].
<!--
<!--
===Journey Planner===
===Journey Planner===
Line 41: Line 40:
===Network Statement===
===Network Statement===
DETAILS (MAY NOT EXIST)
DETAILS (MAY NOT EXIST)
 
-->
===Gauge===
===Gauge===
DETAILS
Metre gauge


===Electrification===
===Electrification===
DETAILS
None
 
<!--
===Rule of the road===
===Rule of the road===
DETAILS
DETAILS
Line 65: Line 64:
==Trams==
==Trams==
DETAILS
DETAILS
 
-->
==Recent and Future Changes==
==Recent and Future Changes==
===Recent Changes===
===Recent Changes===
DETAILS
Emergency rehabilitation work on the line from Tororo, near the Kenyan border, to Mukono (near Kampala) has been completed. Work on the Mukono - Kampala section started in April 2023.


=== Future Changes===
=== Future Changes===
DETAILS
Reconstruction work, lasting about two years, has started on the 382 km line from Tororo to Gulu, in the north west. This has had no traffic for about 30 years. It is planned to introduce a passenger service and to transport at least 500,000 tonnes of freight by 2025-26.
-->
==Obscure and Sparse Passenger Services==
==Obscure and Sparse Passenger Services==
None known - the compilers would be grateful for any updates.
None known - the compilers would be grateful for any updates.

Latest revision as of 10:24, 15 September 2023

Country Details

See Wikipedia

National Railway System

National Railway Operator

Uganda Railways Corporation

Timetable

Gauge

Metre gauge

Electrification

None

Recent and Future Changes

Recent Changes

Emergency rehabilitation work on the line from Tororo, near the Kenyan border, to Mukono (near Kampala) has been completed. Work on the Mukono - Kampala section started in April 2023.

Future Changes

Reconstruction work, lasting about two years, has started on the 382 km line from Tororo to Gulu, in the north west. This has had no traffic for about 30 years. It is planned to introduce a passenger service and to transport at least 500,000 tonnes of freight by 2025-26.

Obscure and Sparse Passenger Services

None known - the compilers would be grateful for any updates.