Qatar: Difference between revisions

Jump to navigationJump to search
add Qatar Rail and metro & light rail
 
(34 intermediate revisions by 2 users not shown)
Line 4: Line 4:
==National Railway System==
==National Railway System==
===National Railway Operator===
===National Railway Operator===
Established in 2011, Qatar Rail is responsible for the country’s rail network, which at present consists of the Doha Metro and the Lusail Tram, and also the future Long Distance Passenger and Freight Rail project.  
Established in 2011, [https://www.qr.com.qa/home Qatar Rail] is responsible for the country’s rail network, which at present consists of the Doha Metro and the Lusail Tram, and also the future Long Distance Passenger and Freight Rail project.  
<!--
<!--
==Timetable==
==Timetable==
Line 21: Line 21:
LINK
LINK
-->
-->
==Maps==
==Maps==
===Printed Maps===
===Printed Maps===
Line 37: Line 38:
===Network Statement===
===Network Statement===
DETAILS (MAY NOT EXIST)
DETAILS (MAY NOT EXIST)
 
-->
===Gauge===
===Gauge===
DETAILS
Standard


===Electrification===
===Electrification===
DETAILS
750 V DC


===Rule of the road===
===Rule of the road===
DETAILS
Right
 
<!--
===Distances===
===Distances===
DETAILS
DETAILS
Line 56: Line 57:
DETAILS
DETAILS
-->
-->
==Metro and light rail systems==
==Metro and light rail systems==
* Doha Metro: three lines, with an overall length of 76 km, and 37 stations
* [https://www.timeoutdoha.com/travel/doha-metro-guide Doha Metro]: three lines, with an overall length of 76 km, and 37 stations.
* Lusail Tram: a light rail network north of Doha. The first phase, a 6 station section of the Orange Line, opened on 1 January 2022.
* [https://www.timeoutdoha.com/travel/education-city-tram-guide Education City Tram]; A 12 km light rail network west of Doha. The 6 km of the first two phases had opened by 17 November 2021 with the Green Line following 29 July 2023.
<!--
* [https://www.qr.com.qa/home Lusail Tram]: a 39 km light rail network north of Doha.  
 
See UrbanRail for basic [https://urbanrail.net/as/doha/doha.htm Doha] system diagrams.
 
==Trams==
* The [https://en.wikipedia.org/wiki/Msheireb_Tram Msheireb Tram], in downtown Doha, operates on a closed circuit 2 km loop with 9 stops. It opened on 30 December 2019, is owned by the Qatar Foundation and is free to use. See [https://www.timeoutdoha.com/attractions/msheireb-tram-quick-guide Tram Guide].
 
==Recent and Future Changes==
==Recent and Future Changes==
===Recent Changes===
===Recent Changes===
DETAILS
The first phase, a 6 station, 6 km section of the Lusail Orange Line, opened on 1 January 2022. 
 
The [https://www.timeoutdoha.com/travel/education-city-tram-green-line Education City] Tram, Green Line, opened on 31 July 2023, completing the 12 km network.
 
The rest of the Lusail Orange line, with 11 more stations, opened on 8 April 2024. The first 10 stations of the Pink line also opened on 8 April 2024. The 10 stations of the Turquoise line opened on 6 January 2025.


=== Future Changes===
=== Future Changes===
DETAILS
 
-->
The Lusail Purple Line, with 5 stations, is currently under construction.<br>
==Obscure and Sparse Passenger Services==
On 8 October 2025 the cabinet approved the long-awaited plan to build a railway from Doha to Saudi Arabia.
None known
 
<!--
<!--
==Special Notes==
==Special Notes==
DETAILS
DETAILS
-->
-->
==Lines with Obscure or Sparse passenger services==
None known.
[[Category:Countries in Asia]][[Category:Countries]]
[[Category:Countries in Asia]][[Category:Countries]]

Latest revision as of 09:46, 16 October 2025

Country Details

See Wikipedia

National Railway System

National Railway Operator

Established in 2011, Qatar Rail is responsible for the country’s rail network, which at present consists of the Doha Metro and the Lusail Tram, and also the future Long Distance Passenger and Freight Rail project.

Maps

Printed Maps

World Rail Atlas - The Middle East and Caucasus by Neil Robinson.

Gauge

Standard

Electrification

750 V DC

Rule of the road

Right

Metro and light rail systems

  • Doha Metro: three lines, with an overall length of 76 km, and 37 stations.
  • Education City Tram; A 12 km light rail network west of Doha. The 6 km of the first two phases had opened by 17 November 2021 with the Green Line following 29 July 2023.
  • Lusail Tram: a 39 km light rail network north of Doha.

See UrbanRail for basic Doha system diagrams.

Trams

  • The Msheireb Tram, in downtown Doha, operates on a closed circuit 2 km loop with 9 stops. It opened on 30 December 2019, is owned by the Qatar Foundation and is free to use. See Tram Guide.

Recent and Future Changes

Recent Changes

The first phase, a 6 station, 6 km section of the Lusail Orange Line, opened on 1 January 2022.

The Education City Tram, Green Line, opened on 31 July 2023, completing the 12 km network.

The rest of the Lusail Orange line, with 11 more stations, opened on 8 April 2024. The first 10 stations of the Pink line also opened on 8 April 2024. The 10 stations of the Turquoise line opened on 6 January 2025.

Future Changes

The Lusail Purple Line, with 5 stations, is currently under construction.
On 8 October 2025 the cabinet approved the long-awaited plan to build a railway from Doha to Saudi Arabia.


Lines with Obscure or Sparse passenger services

None known.