Sri Lanka: Difference between revisions

Jump to navigationJump to search
Seat 61 link added
Timetable: App added
 
(43 intermediate revisions by 5 users not shown)
Line 1: Line 1:
==Country Details==
==Country details==
See [https://en.wikipedia.org/wiki/Sri_Lanka Wikipedia]
See [https://en.wikipedia.org/wiki/Sri_Lanka Wikipedia]
<!--
==National Railway System==
===National Railway Operator===
DETAILS
-->
==Timetable==
Extensive information is available at the [https://www.seat61.com/SriLanka.htm Man in Seat 61].
<!--
===Journey Planner===
LINK


===Downloadable Timetable===
==National railway system==
LINK
The national railway operator is [https://railway.gov.lk/ Sri Lanka Railways] (SLR).


===Printed Timetable===
==Infrastructure==
DETAILS


===Engineering Information===
===Gauge===  
LINK
*1676 mm (5 foot 6 inches)
===Electrification===
*None
===Rule of the road===
*Left


==Maps==
===Maps===
DETAILS
There are no known printed maps.


===Printed Maps===
Online maps are available at:
DETAILS
* [https://railway.gov.lk/web/index.php?option=com_content&view=article&id=162&Itemid=186&lang=en SLR website] but inaccurate.
* [http://bueker.net/trainspotting/maps_sri-lanka.php Railways Through Europe]


===Web-based Maps===
===Timetable===
DETAILS
Extensive information is available at the [https://www.seat61.com/SriLanka.htm Man in Seat 61] but this may not be current timings.


* Journey planner: [https://eservices.railway.gov.lk/schedule/homeAction.action?lang=en SLR website] (English language)
* Not tested by the Compilers but a January 2024 traveller recommended the RDNSM.LK App as the best found for times and train numbers
* Downloadable timetable: none known
* Printed timetable: No longer available according to Winter 2024 visitors. In 2017/18 a printed timetable was available at ticket offices costing Rs 150/-.
* A timetable derived from the official SLR website at January 2023 can be found (by subscribers to the [https://groups.io/g/World-Rail-Gen WRG group]) at [https://groups.io/g/World-Rail-Gen/files/Timetables/SLR%20Timetable%20Jan%202023.xls this link]. Some services were suspended - as indicated where known.
* Engineering information: long-term engineering works ''may'' be reported as news on the front page of the SLR website.
<!--
==Ticketing==
==Ticketing==
DETAILS
DETAILS


==Infrastructure==
===Distances===
===Infrastructure Authority===
DETAILS
DETAILS
-->


===Network Statement===
==Other railways==
DETAILS (MAY NOT EXIST)
The line north from Noor Nagar (terminus of passenger services from Colombo via Puttalam) is privately owned and freight only.


===Gauge===
==Tourist railways==
DETAILS
None known.


===Electrification===
==Metro and light rail systems==
DETAILS
None. A light rail system ''may'' be constructed in Colombo.


===Rule of the road===
==Recent and Future Changes==
DETAILS
===Recent Changes===


===Distances===
Work to renovate the 59 km from Maradana to Avissawella, on the Kelani Valley line, was launched on 7 September 2023 and is scheduled for completion in 2 years.
DETAILS


==Other Railways==
Train operations from Colombo to Jaffna were due to resume from the 15 July 2023, after closure on 5 January 2023, for modernisation of the railway track between Anuradhapura and Omanthai, under Maho-Omanthai Railway Development project.
DETAILS


==Tourist Lines==
28km of new line from Matara to Beliatta opened in 2019, 44 km onwards to Hambantota is planned.
DETAILS


==Metros==
=== Future Changes===
DETAILS


==Trams==
It is an aspiration to connect up around the eastern coast from Matera to Batticaloa, some parts have been built and opened.
DETAILS


==Recent and Future Changes==
The rehabilitation of 128 km of the Maho to Omanthai railway route, on the Northern Line, is taking place in four phases over 3 years. Two phases have now been completed. Renovation from Mahawa to Anuradhapura began on 7 January 2024.
===Recent Changes===
DETAILS


=== Future Changes===
==Lines with Obscure or Sparse passenger services==
DETAILS
See [[Sri Lanka - Lines with Obscure or Sparse passenger services]].
-->
==Obscure and Sparse Passenger Services==
See [http://www.psul4all.free-online.co.uk/wbe.htm#LK PSUL: World Beyond Europe]
<!--
<!--
==Special Notes==
==Special Notes==
DETAILS
DETAILS
-->
-->
==See also==
{{Navbox Sri Lanka}}
[[Category:Countries in Asia]][[Category:Countries]]
[[Category:Countries in Asia]][[Category:Countries]]

Latest revision as of 12:34, 2 February 2025

Country details

See Wikipedia

National railway system

The national railway operator is Sri Lanka Railways (SLR).

Infrastructure

Gauge

  • 1676 mm (5 foot 6 inches)

Electrification

  • None

Rule of the road

  • Left

Maps

There are no known printed maps.

Online maps are available at:

Timetable

Extensive information is available at the Man in Seat 61 but this may not be current timings.

  • Journey planner: SLR website (English language)
  • Not tested by the Compilers but a January 2024 traveller recommended the RDNSM.LK App as the best found for times and train numbers
  • Downloadable timetable: none known
  • Printed timetable: No longer available according to Winter 2024 visitors. In 2017/18 a printed timetable was available at ticket offices costing Rs 150/-.
  • A timetable derived from the official SLR website at January 2023 can be found (by subscribers to the WRG group) at this link. Some services were suspended - as indicated where known.
  • Engineering information: long-term engineering works may be reported as news on the front page of the SLR website.

Other railways

The line north from Noor Nagar (terminus of passenger services from Colombo via Puttalam) is privately owned and freight only.

Tourist railways

None known.

Metro and light rail systems

None. A light rail system may be constructed in Colombo.

Recent and Future Changes

Recent Changes

Work to renovate the 59 km from Maradana to Avissawella, on the Kelani Valley line, was launched on 7 September 2023 and is scheduled for completion in 2 years.

Train operations from Colombo to Jaffna were due to resume from the 15 July 2023, after closure on 5 January 2023, for modernisation of the railway track between Anuradhapura and Omanthai, under Maho-Omanthai Railway Development project.

28km of new line from Matara to Beliatta opened in 2019, 44 km onwards to Hambantota is planned.

Future Changes

It is an aspiration to connect up around the eastern coast from Matera to Batticaloa, some parts have been built and opened.

The rehabilitation of 128 km of the Maho to Omanthai railway route, on the Northern Line, is taking place in four phases over 3 years. Two phases have now been completed. Renovation from Mahawa to Anuradhapura began on 7 January 2024.

Lines with Obscure or Sparse passenger services

See Sri Lanka - Lines with Obscure or Sparse passenger services.

See also