Argentina: Difference between revisions
Jump to navigationJump to search
→Trams/LRT: add opening date |
|||
Line 65: | Line 65: | ||
--> | --> | ||
==Trams/LRT== | ==Trams/LRT== | ||
The 17 km standard gauge [https://www.urbanrail.net/am/mend/mendoza.htm Mendoza Light Rail] line built along the former railway corridor of the Ferrocarril General San Martín (FCGSM). | The 17 km standard gauge [https://www.urbanrail.net/am/mend/mendoza.htm Mendoza Light Rail] line built along the former railway corridor of the Ferrocarril General San Martín (FCGSM) opened in 2012. | ||
<!-- | <!-- | ||
==Recent and Future Changes== | ==Recent and Future Changes== |
Revision as of 16:54, 17 September 2023
Country Details
See Wikipedia
Timetable
- Online: unofficial timetable information is available at Fahrplancenter. Note that this may be out of date.
- Printed: summary timetables are available in some editions of the European Rail Timetable.
Summary information is also available at the Man in Seat 61.
Trams/LRT
The 17 km standard gauge Mendoza Light Rail line built along the former railway corridor of the Ferrocarril General San Martín (FCGSM) opened in 2012.
Obscure and Sparse Passenger Services
None known