Ecuador: Difference between revisions
Jump to navigationJump to search
(→Gauge: standard) |
(→Electrification: tramway and Metro) |
||
Line 48: | Line 48: | ||
===Electrification=== | ===Electrification=== | ||
750 V DC for tramway | |||
1500 V DC for Metro | |||
===Rule of the road=== | ===Rule of the road=== |
Revision as of 22:40, 16 September 2023
Country Details
See Wikipedia
Timetable
Some information is available at the Man in Seat 61.
Note: the railway in Ecuador became bankrupt in 2020 and ceased operating. Money is being raised to restart operations, hopefully in 2023.
Gauge
1435 mm (4' 8 1/2 ") Standard
Electrification
750 V DC for tramway 1500 V DC for Metro
Rule of the road
DETAILS
Distances
DETAILS
Other Railways
DETAILS
Tourist Lines
DETAILS
Metros
The Quito Metro official inauguration was on 21 December 2022 and commercial service started on 2 May 2023. However the syet was shut down after problems and is now expected to re-open until December 2023 with full operation expected in the second quarter of 2024.
Trams
The standard gauge Cuenca Tramway opened 25 May 2020.
Obscure and Sparse Passenger Services
None known