Ecuador: Difference between revisions

Jump to navigationJump to search
Line 48: Line 48:


===Electrification===
===Electrification===
750 V DC for tramway
*750 V DC for tramway
1500 V DC for Metro
*1500 V DC for Quito Metro


===Rule of the road===
===Rule of the road===

Revision as of 22:45, 16 September 2023

Country Details

See Wikipedia

Timetable

Some information is available at the Man in Seat 61.

Note: the railway in Ecuador became bankrupt in 2020 and ceased operating. Money is being raised to restart operations, hopefully in 2023.

Gauge

1435 mm (4' 8 1/2 ") Standard

Electrification

  • 750 V DC for tramway
  • 1500 V DC for Quito Metro

Rule of the road

Mainly single track bt not known on metro/tramway.

Distances

DETAILS

Other Railways

DETAILS

Tourist Lines

DETAILS

Metros

The Quito Metro official inauguration was on 21 December 2022 and commercial service started on 2 May 2023. However the system was shut down on 11 May 2023, after technical problems, and is now not expected to re-open until December 2023 with full operation expected in the second quarter of 2024.

Trams

The standard gauge Cuenca Tramway opened 25 May 2020.


Obscure and Sparse Passenger Services

None known