Ecuador: Difference between revisions

Jump to navigationJump to search
(→‎Future Changes: six sections of main line to reopen in 2023)
(→‎Metros: Metro Quito Metro reopened 1 Dec 2023)
Line 67: Line 67:


==Metros==
==Metros==
The [https://en.wikipedia.org/wiki/Quito_Metro Quito Metro] is currently shut down with re-opening not expected until December 2023.
The [https://en.wikipedia.org/wiki/Quito_Metro Quito Metro] resumed commercial operation on 1 December 2023.


==Trams==
==Trams==

Revision as of 15:01, 30 December 2023

Country Details

See Wikipedia

Timetable

Some information is available at the Man in Seat 61.

Note: the railway in Ecuador became bankrupt in 2020 and ceased operating with their assets being transferred to the Ecuadorian State. . Money is being raised to restart operations, hopefully in 2023.

Gauge

  • 1067 mm (3 feet 6 inches) Cape; for main railways.
  • 1435 mm (4 feet 8½ inches) Standard; for metro and tramway.

Electrification

  • 750 V DC for Cuenca Tramway
  • 1500 V DC for Quito Metro

Rule of the road

Mainly single track but not known on metro/tramway.

Metros

The Quito Metro resumed commercial operation on 1 December 2023.

Trams

The standard gauge Cuenca Tramway opened 25 May 2020.

Recent and Future Changes

Recent Changes

The Quito Metro official inauguration was on 21 December 2022 and commercial service started on 2 May 2023. However the system was shut down on 11 May 2023, after technical problems.

Future Changes

The Quito Metro is now not expected to re-open until December 2023 with full operation expected in the second quarter of 2024.

The Government aims to reopen six sections of main line railways for tourism purposes in 2023.

Obscure and Sparse Passenger Services

None known