Ecuador

Revision as of 22:40, 16 September 2023 by Robert Holliday (talk | contribs) (→‎Electrification: tramway and Metro)
Jump to navigationJump to search

Country Details

See Wikipedia

Timetable

Some information is available at the Man in Seat 61.

Note: the railway in Ecuador became bankrupt in 2020 and ceased operating. Money is being raised to restart operations, hopefully in 2023.

Gauge

1435 mm (4' 8 1/2 ") Standard

Electrification

750 V DC for tramway 1500 V DC for Metro

Rule of the road

DETAILS

Distances

DETAILS

Other Railways

DETAILS

Tourist Lines

DETAILS

Metros

The Quito Metro official inauguration was on 21 December 2022 and commercial service started on 2 May 2023. However the syet was shut down after problems and is now expected to re-open until December 2023 with full operation expected in the second quarter of 2024.

Trams

The standard gauge Cuenca Tramway opened 25 May 2020.


Obscure and Sparse Passenger Services

None known