Peru: Difference between revisions
Jump to navigationJump to search
(→Metros: update lima metro line 2 opening + open R+FC section) |
(→Recent Changes: first 5 km of Lima Metro line 2 opened 21 Dec 2023) |
||
Line 76: | Line 76: | ||
==Recent and Future Changes== | ==Recent and Future Changes== | ||
===Recent Changes=== | ===Recent Changes=== | ||
The first 5 km of Lima Metro line 2 opened on 21 December 2023 with a free service. | |||
<!-- | <!-- | ||
=== Future Changes=== | === Future Changes=== |
Revision as of 20:32, 2 January 2024
Country Details
See Wikipedia
Timetable
- Online: unofficial timetable information is available at Fahrplancenter. Note that this may be out of date.
- Printed: summary timetables are available in some editions of the European Rail Timetable.
There is extensive information at the Man in Seat 61.
Maps
See Maps and Plans
Infrastructure
Gauges
- 1435 mm - Standard
- 914 mm - 3 Foot
Electrification
1500 V DC - Lima Metro
Metros
Lima
- 35 km long, 1435 mm gauge
- Line 1 - Spanish is 35 km long.
- Line 2 is 5 km long
- Lima Metro - English guide
Recent and Future Changes
Recent Changes
The first 5 km of Lima Metro line 2 opened on 21 December 2023 with a free service.