Qatar: Difference between revisions

Jump to navigationJump to search
(page created)
 
(add Qatar Rail and metro & light rail)
Line 1: Line 1:
==Country Details==
==Country Details==
See [https://en.wikipedia.org/wiki/Qatar Wikipedia]
See [https://en.wikipedia.org/wiki/Qatar Wikipedia]
<!--
 
==National Railway System==
==National Railway System==
===National Railway Operator===
===National Railway Operator===
DETAILS
Established in 2011, Qatar Rail is responsible for the country’s rail network, which at present consists of the Doha Metro and the Lusail Tram, and also the future Long Distance Passenger and Freight Rail project.
 
<!--
==Timetable==
==Timetable==
DETAILS
DETAILS
Line 55: Line 55:
==Tourist Lines==
==Tourist Lines==
DETAILS
DETAILS
 
-->
==Metro and light rail systems==
==Metro and light rail systems==
DETAILS
* Doha Metro: three lines, with an overall length of 76 km, and 37 stations
 
* Lusail Tram: a light rail network north of Doha. The first phase, a 6 station section of the Orange Line, opened on 1 January 2022.
<!--
==Recent and Future Changes==
==Recent and Future Changes==
===Recent Changes===
===Recent Changes===

Revision as of 18:45, 26 July 2023

Country Details

See Wikipedia

National Railway System

National Railway Operator

Established in 2011, Qatar Rail is responsible for the country’s rail network, which at present consists of the Doha Metro and the Lusail Tram, and also the future Long Distance Passenger and Freight Rail project.

Maps

Printed Maps

World Rail Atlas - The Middle East and Caucasus by Neil Robinson.

Metro and light rail systems

  • Doha Metro: three lines, with an overall length of 76 km, and 37 stations
  • Lusail Tram: a light rail network north of Doha. The first phase, a 6 station section of the Orange Line, opened on 1 January 2022.

Obscure and Sparse Passenger Services

None known