Qatar: Difference between revisions

Jump to navigationJump to search
(→‎National Railway Operator: Add Gatar Rail link)
(→‎Metro and light rail systems: add UrbanRail Link)
Line 60: Line 60:
* Doha Metro: three lines, with an overall length of 76 km, and 37 stations
* Doha Metro: three lines, with an overall length of 76 km, and 37 stations
* Lusail Tram: a light rail network north of Doha. The first phase, a 6 station section of the Orange Line, opened on 1 January 2022.
* Lusail Tram: a light rail network north of Doha. The first phase, a 6 station section of the Orange Line, opened on 1 January 2022.
<!--
 
See UrbanRail for basic [https://urbanrail.net/as/doha/doha.htm Doha] system diagrams
 
==Recent and Future Changes==
==Recent and Future Changes==
===Recent Changes===
===Recent Changes===
DETAILS
DETAILS
 
<!--
=== Future Changes===
=== Future Changes===
DETAILS
DETAILS
-->
-->
==Obscure and Sparse Passenger Services==
==Obscure and Sparse Passenger Services==
None known  
None known  

Revision as of 10:08, 9 August 2023

Country Details

See Wikipedia

National Railway System

National Railway Operator

Established in 2011, Qatar Rail is responsible for the country’s rail network, which at present consists of the Doha Metro and the Lusail Tram, and also the future Long Distance Passenger and Freight Rail project.

Maps

Printed Maps

World Rail Atlas - The Middle East and Caucasus by Neil Robinson.

Metro and light rail systems

  • Doha Metro: three lines, with an overall length of 76 km, and 37 stations
  • Lusail Tram: a light rail network north of Doha. The first phase, a 6 station section of the Orange Line, opened on 1 January 2022.

See UrbanRail for basic Doha system diagrams

Recent and Future Changes

Recent Changes

DETAILS

Obscure and Sparse Passenger Services

None known