Sri Lanka: Difference between revisions

Jump to navigationJump to search
No edit summary
 
(15 intermediate revisions by the same user not shown)
Line 3: Line 3:


==National railway system==
==National railway system==
The national railway operator is [http://www.railway.gov.lk/ Sri Lanka Railways] (SLR).
The national railway operator is [https://railway.gov.lk/ Sri Lanka Railways] (SLR).


===Infrastructure===
===Infrastructure===
* Gauge: 1676mm (5'6")  
* Gauge: 1676 mm (5 foot 6 inches)  
* Electrification: none
* Electrification: none
* Rule of the road: left
* Rule of the road: left
Line 14: Line 14:


Online maps are available at:
Online maps are available at:
* [http://www.railway.gov.lk/web/index.php?option=com_content&view=article&id=162&Itemid=186&lang=en SLR website]
* [https://railway.gov.lk/web/index.php?option=com_content&view=article&id=162&Itemid=186&lang=en SLR website]
* [http://bueker.net/trainspotting/maps_sri-lanka.php Railways Through Europe]
* [http://bueker.net/trainspotting/maps_sri-lanka.php Railways Through Europe]


Line 31: Line 31:
DETAILS
DETAILS
-->
-->
==Other railways==
==Other railways==
The line north from Noor Nagar (terminus of passenger services from Colombo via Puttalam) is privately owned and freight only.
The line north from Noor Nagar (terminus of passenger services from Colombo via Puttalam) is privately owned and freight only.
Line 39: Line 40:
==Metro and light rail systems==
==Metro and light rail systems==
None. A light rail system ''may'' be constructed in Colombo.
None. A light rail system ''may'' be constructed in Colombo.
<!--
 
==Recent and Future Changes==
==Recent and Future Changes==
===Recent Changes===
===Recent Changes===
DETAILS
 
Work to renovate the 59 km from Maradana to Avissawella, on the Kelani Valley line, was launched on 7 September 2023 and is scheduled for completion in 2 years.
 
Train operations from Colombo to Jaffna were due to resume from the 15 July 2023, after closure on 5 January 2023, for modernisation of the railway track between Anuradhapura and Omanthai, under Maho-Omanthai Railway Development project.


=== Future Changes===
=== Future Changes===
DETAILS
The rehabilitation of 128 km of the Maho to Omanthai railway route, on the Northern Line, is taking place in four phases over 3 years. Two phases have now been completed with final completion target of 31 December 2023.
-->
 
==Obscure and sparse passenger services==
==Obscure and sparse passenger services==
See [http://www.psul4all.free-online.co.uk/wbe.htm#LK PSUL: World Beyond Europe] for Obscure services
See [http://www.psul4all.free-online.co.uk/wbe.htm#LK PSUL: World Beyond Europe] for Obscure services

Latest revision as of 21:15, 18 September 2023

Country details

See Wikipedia

National railway system

The national railway operator is Sri Lanka Railways (SLR).

Infrastructure

  • Gauge: 1676 mm (5 foot 6 inches)
  • Electrification: none
  • Rule of the road: left

Maps

There are no known printed maps.

Online maps are available at:

Timetable

Extensive information is available at the Man in Seat 61.

  • Journey planner: SLR website (English language)
  • Downloadable timetable: none known
  • Printed timetable: a printed timetable was available at ticket offices in 2017/18 costing Rs 150/-. It is not known whether this is still published as of 2023.
  • Engineering information: long-term engineering works may be reported as news on the front page of the SLR website.

Other railways

The line north from Noor Nagar (terminus of passenger services from Colombo via Puttalam) is privately owned and freight only.

Tourist railways

None known.

Metro and light rail systems

None. A light rail system may be constructed in Colombo.

Recent and Future Changes

Recent Changes

Work to renovate the 59 km from Maradana to Avissawella, on the Kelani Valley line, was launched on 7 September 2023 and is scheduled for completion in 2 years.

Train operations from Colombo to Jaffna were due to resume from the 15 July 2023, after closure on 5 January 2023, for modernisation of the railway track between Anuradhapura and Omanthai, under Maho-Omanthai Railway Development project.

Future Changes

The rehabilitation of 128 km of the Maho to Omanthai railway route, on the Northern Line, is taking place in four phases over 3 years. Two phases have now been completed with final completion target of 31 December 2023.

Obscure and sparse passenger services

See PSUL: World Beyond Europe for Obscure services

The following lines have few trains (although others may not be much more frequent) - fewer than three trains each way on at least three days a week - or do not run each weekday. The printed timetable does not display table numbers.

Table Route Notes
Medawachchiya - Talaimannar Pier One pair daily worked from Talaimannar Pier end
Galoya Junction - Trincomalee
Kosgama - Avissawella Note this is a "with the flow" commuter service to/from Colombo so it is impossible to complete a day return over the full line from Colombo
Puttalam - Noor Nagar