Ethiopia: Difference between revisions
Jump to navigationJump to search
(→Gauges) |
(→Electrification: 750 v DC) |
||
Line 17: | Line 17: | ||
===Electrification=== | ===Electrification=== | ||
750 V DC | 750 V DC for Addis Ababa LRT | ||
===Rule of the road=== | ===Rule of the road=== | ||
Left; | Left; |
Revision as of 16:18, 3 August 2023
Country Details
See Wikipedia
Railway System
National Railway Operator
Infrastructure
Gauges
- Metre and Standard
Electrification
750 V DC for Addis Ababa LRT
Rule of the road
Left;
Maps
- Online: Railways Through Europe - out of date
- Printed: World Rail Atlas - North, East and Central Africa by Neil Robinson - out of date
Timetable
- Online: unofficial timetable information is available at Fahrplancenter. Note that this may be substantially out of date.
- Printed: summary timetables are available in some editions of the European Rail Timetable.
Information is available at the Man in Seat 61.
Trams/LRT Systems
Addis Ababa has a 2 line, 32 km, Light Rail System run by the Ethiopian Railway Corporation.
- Gauge: standard
- Electrification: 750V DC overhead
See UrbanRail for system diagram.
Obscure and Sparse Passenger Services
None known