Tanzania: Difference between revisions

Jump to navigationJump to search
(page created)
 
 
(7 intermediate revisions by one other user not shown)
Line 1: Line 1:
==Country Details==
==Country Details==
See [https://en.wikipedia.org/wiki/Tanzania Wikipedia]
See [https://en.wikipedia.org/wiki/Tanzania Wikipedia]
<!--
==National Railway System==
==National Railway System==
===National Railway Operator===
===National Railway Operator===
DETAILS
[https://www.trc.co.tz/ Tanzania Railways Corporation (TRC)] is a state-owned enterprise which operates the following lines:
-->
* Central Line:  Dar es Salaam - Dodoma (the political capital) - Kigoma (on Lake Tanganyika), with a branch to Mwanza (on Lake Victoria).
* Tanga Line: Tanga - Arusha.
* Korogwe - Ruvu, linking the two lines above.
* The Tanzania Standard Gauge Railway, when this opens
 
The [https://www.tazarasite.com/ Tanzania-Zambia Railway Authority (TAZARA)], which operates the Dar es Salaam - New Kapiri Mposhi (Zambia) line.
 
==Timetable==
==Timetable==
* Online: unofficial timetable information is available at [https://www.fahrplancenter.com/Tanzania_Index.html Fahrplancenter]. Note that this may be substantially out of date.
* Online: unofficial timetable information is available at [https://www.fahrplancenter.com/Tanzania_Index.html Fahrplancenter]. Note that this may be substantially out of date.
Line 33: Line 38:
==Ticketing==
==Ticketing==
DETAILS
DETAILS
 
-->
==Infrastructure==
==Infrastructure==
===Infrastructure Authority===
===Infrastructure Authority===
DETAILS
None


===Network Statement===
===Network Statement===
DETAILS (MAY NOT EXIST)
None
 
===Gauge===
===Gauge===
DETAILS
TRC: Metre gauge. The Standard Gauge Railway will be 1435mm</br>
TAZARA: 1067mm (3ft 6in)


===Electrification===
===Electrification===
DETAILS
None at present. The Standard Gauge Railway will be 25kV AC


===Rule of the road===
===Rule of the road===
DETAILS
All lines are single track


===Distances===
===Distances===
DETAILS
No detailed information known
 
==Other Railways==
==Other Railways==
DETAILS
None


==Tourist Lines==
==Tourist Lines==
DETAILS
None known


==Metros==
==Metros==
DETAILS
None


==Trams==
==Trams==
DETAILS
None


==Recent and Future Changes==
==Recent and Future Changes==
===Recent Changes===
===Recent Changes===
DETAILS
None known


=== Future Changes===
=== Future Changes===
DETAILS
The Tanzania Standard Gauge Railway, providing a link to Rwanda and Uganda, is under construction.
-->
* Phase 1, Dar es Salaam – Morogoro: completed in April 2022 and is at present under test.
* Phase 2, Morogoro – Makutopora: scheduled completion was by December 2022, but this has not yet been achieved.
* Phase 3, Makutupora – Tabora: contract placed but no further information
* Phases 4,5 & 6: No information available, but probably as yet unfunded.
 
==Obscure and Sparse Passenger Services==
==Obscure and Sparse Passenger Services==
None known  
None known  

Latest revision as of 13:28, 10 September 2023

Country Details

See Wikipedia

National Railway System

National Railway Operator

Tanzania Railways Corporation (TRC) is a state-owned enterprise which operates the following lines:

  • Central Line: Dar es Salaam - Dodoma (the political capital) - Kigoma (on Lake Tanganyika), with a branch to Mwanza (on Lake Victoria).
  • Tanga Line: Tanga - Arusha.
  • Korogwe - Ruvu, linking the two lines above.
  • The Tanzania Standard Gauge Railway, when this opens

The Tanzania-Zambia Railway Authority (TAZARA), which operates the Dar es Salaam - New Kapiri Mposhi (Zambia) line.

Timetable

  • Online: unofficial timetable information is available at Fahrplancenter. Note that this may be substantially out of date.
  • Printed: summary timetables are available in some editions of the European Rail Timetable.

Extensive information is available at the Man in Seat 61, including the TAZARA service to Zambia.

Maps

Printed Maps

World Rail Atlas - North, East and Central Africa by Neil Robinson.

Infrastructure

Infrastructure Authority

None

Network Statement

None

Gauge

TRC: Metre gauge. The Standard Gauge Railway will be 1435mm
TAZARA: 1067mm (3ft 6in)

Electrification

None at present. The Standard Gauge Railway will be 25kV AC

Rule of the road

All lines are single track

Distances

No detailed information known

Other Railways

None

Tourist Lines

None known

Metros

None

Trams

None

Recent and Future Changes

Recent Changes

None known

Future Changes

The Tanzania Standard Gauge Railway, providing a link to Rwanda and Uganda, is under construction.

  • Phase 1, Dar es Salaam – Morogoro: completed in April 2022 and is at present under test.
  • Phase 2, Morogoro – Makutopora: scheduled completion was by December 2022, but this has not yet been achieved.
  • Phase 3, Makutupora – Tabora: contract placed but no further information
  • Phases 4,5 & 6: No information available, but probably as yet unfunded.

Obscure and Sparse Passenger Services

None known